Project Lead
28 Bedford St.
Location: Belfast
Contractor: HJ O’Boyle Ltd
Architects: McCollum Conservation/Michelle Atkinson.
Completion: May 2023
Make an Enquiry
JP Corry was part of the restoration work at 28 Bedford St. in Belfast. We supplied main contractor HJ O’Boyle with the renewal of cast iron downpipes.
The downpipes supplied were 75mm & 100mm diameter which were fitted with two part drive-in stay hooks.
These were supplied in black Classical Plus finish