Omagh Integrated Primary School
Make an Enquiry
Built on a new greenfield site beside Drumragh Integrated College, Omagh Integrated Primary School has been fully operational since September 2018. The building encompasses a single-story, 14-classroom school with a bright and modern environment, featuring all the mod cons required in today’s digital age. JP Corry supplied only the highest quality products to this prestigious project. Approximately 250m of 75mm aluminium downpipe and hopper heads were selected and delivered by JP Corry. All products supplied were specially powder coated to RAL 7016.
Key Features:
The Project was delivered to BREEAM “Very Good”
Rainwater harvesting, attenuation tanks and flow controls have been installed onsite
Key Stage 1, Key Stage 2 and Nursery playground equipment
5-Aside Football Pitch
The site is “Gas to the West” enabled
The project delivered 274 Buy Social employment weeks